viggenviggen/SYS_SPEC // REV 1.2
Precision machined industrial brushed titanium hex nut fastener with vertical electric blue glowing lightning slot

Your machine is done.
Your handover isn't.

FINAL_v2_FINAL_REAL.zip is not a handover package.
SCROLL
MANIFESTO // RUNTIME CONTRADICTION
Machines get handed over.
Knowledge gets lost.
Viggen locks the record.
// AT REST: An automation cell embodies months of tuning, drive parameters, and hardware revisions. The moment commissioning ends, the record disperses across technician laptops and unversioned folders.
01 — FAILURE MODESFOUR SYSTEMIC LEAKS
✗

The as-built black hole.

The drawing revision everyone assumes they have isn't the one running in the control cabinet. Field wire adjustments during FAT vanish into unredlined local PDF copies.

✗

The shared-drive illusion.

Date-stamped ZIP archives, an unverified Excel checklist, and optimism. Filesystem timestamps get modified on every network copy. Nothing is cryptographically sealed.

✗

The 2 AM discovery.

The customer's critical variable frequency drive parameter set was never dropped into the release bundle. Plant engineering discovers this eight months later during an unscheduled midnight changeover.

✗

The unanswerable question.

"Has this ladder logic file changed since FAT signoff?" Without deterministic SHA-256 digests, no engineer on site can answer with mathematical certainty.

02 — THE INSTRUMENTLIVE APPLICATION SPECIMEN // HOVER NODES TO INSPECT
[INTERACTIVE STAGE]Hover pins i to inspect cryptographic primitives
ENGINE: macOS Darwin x86_64 / arm64AIR-GAP COMPILED
logoViggen Release Tool— Cartoner Line 04 (Customer Handover v1.2)
WORKSPACELOCAL
●Cartoner Line 04
84%
●Palletizer 02
100%
●Filler Line 01
62%
●Wrapper 07
91%
RELEASES
v1.2 (Current)RC-3
v1.1 (Factory Gate)
v1.0 (FAT Alpha)
AIR-GAP ISOLATED
SQLite index locked. 0 network egress events detected.
HOTSPOT 01
⚡ READINESS GATEWAY: 84%
Deterministic closeout engine blocks final OEM packaging until all 18 industrial categories resolve safety & binary dependencies.
RULE: NO_UNCHECKED_REVISION // FAT_LOCK = TRUE
84%
Closeout Readiness Score2 BLOCKERS
16 OF 18 ARTIFACT NODES VERIFIED AND DIGITALLY SEALED
SHA-256 VALIDATION
16 / 18 SIGNED
HANDOVER ARTIFACT BUNDLES (10 CATEGORIES)DRAG FILES DIRECTLY INTO NODES
✓
01. PLC Backups
Studio 5000 v34 · L83E · Rev 3.2
LOCKED
✓
02. Safety Signature
SIL-3 GuardLogix Hash: d8e2...
VERIFIED
!
03. Schematics (EPLAN)
CONFLICT: Rev B vs Rev C field redline
BLOCKED
✗
04. Drive Parameters
MISSING: PowerFlex 525 Node 07
BLOCKED
✓
05. HMI Runtime
PanelBuilder 600 · Runtime .mer
LOCKED
✓
06. Acceptance Forms
FAT_Signoff_Signed_Final.pdf
SEALED
✓
07. Parts & BOM
Master_BOM_Rev4.xlsx (Indexed)
PASS
✓
08. Mechanical Assemblies
STEP 3D Package (Air-gap hash)
PASS
✓
09. Calibration Logs
Load cells, Keyence sensors (8/8)
LOCKED
✓
10. Vendor Manuals
Combined 142MB OCR PDF dossier
COMPILED
INTEGRITY: 16/18 VERIFIED·LEDGER HEAD: a3f982...c21e
LOCAL ROOT: ~/Handover/PRJ-001/Line04
HOTSPOT 02
✗ FIELD AUDIT LOCKOUT
Viggen inspects controller hardware trees against physical drive serials. Missing VFD drive parameters would cause an outage during midnight replacement.
EXCEPTION: PAR-4409 UNDOCUMENTED
⚠2 CRITICAL BLOCKERS
VFD Parameter Node 07ACTION
Missing .pf5 file for Main Infeed Motor. Drive running with unarchived tuning.
COM-0142 Drawing ClashREVIEW
Drawing sheet 14-E4 redlined in cabinet, but CAD export is Rev B.
SHA-256 ACTIVITY LOGSTREAMING
PLC_Main_Line04.ACDe81c…44a1
Safety_Guard_Logix.bin93bf…8812
Master_BOM_Signed.pdf20ac…119f
IO_Checkout_FAT.csvbb67…c034
SIGNING AUTHORITY
M. Lindqvist (Lead Controls)
YubiKey 5 NFC Hardware Signed
FIG. 01—VIGGEN RELEASE TOOL · CARTONER LINE 04 · 84% READINESS · TAMPER-EVIDENT ARCHIVAL MATRIX

Blockers caught before the customer discovers them.

DETERMINISTIC PREFLIGHT GATE ACTIVATED — ZERO UNVERIFIED DISPATCHES
logoExport Handover Package• In Review
SECURITY GATE ACTIVE

Review Preflight Requirements

Cartoner Line 04 — Target Release: v1.2-handover-2025.03

16 Passed
2 Blockers
PREFLIGHT VERIFICATION CRITERIA2 UNRESOLVED FLAGS
✓
PLC Firmware & Native Runtime BinaryPASSED
SHA-256 match confirmed against FAT acceptance tag #8129.
HOTSPOT 03
⚡ CRYPTOGRAPHIC IMMUTABILITY
Every exported handover generates a standalone Checksums.sha256 file. Verifiable 30 years from now with native terminal tools without Viggen installed.
LOCAL DIGEST: FIPS-180-4 COMPLIANT
✗
PowerFlex 525 VFD Parameter ExportBLOCKER
Drive 07 (Infeed Servo Slave) lacks parameter backup dump. Export disabled until .pf5 file attached.
!
Electrical CAD Redline ConflictWARNING
Cabinet panel wire delta detected. Current drawing is Rev B, field checkout marked Rev C.
✓
Customer SAT Witness ProtocolSIGNED
Signed by plant representative T. Vance on 2025-02-28.
TARGET OUTPUT BUNDLE (LOCKED ZIP)
📦Line04_Handover_v1.2.zip
📄00_Handover_Report.pdf
📊01_Document_Register.csv
🗂️02_PLC_Native_Backups/
⚡03_Safety_Signatures/
📐04_Electrical_EPLAN_RevC/
📋Release_Manifest.json
🔒Checksums.sha256
// ARCHIVE INTEGRITY: Deterministic ZIP encoding with zero-padded timestamps. Binary identical rebuilds across platforms.
FIG. 02—EXPORT PREFLIGHT GATE · AIR-GAP CHECK · SHA-256 MANIFEST COMPILED IN-MEMORY
03 — PROCEDURETHREE BEATS TO CLOSEOUT
01
STEP 01

Assemble

Drag in artifacts by machine subsystem. PLC native backup pairs automatically with searchable schematic PDF. Viggen organizes ten industrial subsystems cleanly into local workspace nodes.

TARGET: [FAT_SAT/] + [PLC_Backups/] + [EPLAN_RevC/]
02
STEP 02

Verify

Local SHA-256 integrity, revision guard, and live closeout readiness score. Two unarchived VFD nodes or missing safety signoffs? You know before the plant manager ever runs FAT.

STATUS: 2 CRITICAL BLOCKERS PREVENT LOCK
03
STEP 03

Hand over

One master PDF dossier, one locked ZIP archive, one cryptographic checksum manifest. Fully verifiable thirty years from now with native command-line shasum. Absolute zero tool lock-in.

EXPORT: Release_v1.2.bundle (VERIFIED)
04 — FIELD OBSERVATIONS // ALPHA TESTINGFIELD REPORTS // QUOTED WITH PERMISSION

Real handovers. Real machines.
Verified on the alpha build.

Early testers running real machine handovers on the Viggen alpha — quoted with permission, first names only.

[RECORD 01 // CONTROLS ENGINEER]ALPHA BUILD 0.9
“I'd been doing the native-plus-PDF pairing by hand in a spreadsheet for years. Watching Viggen flag a drawing revision clash on its own during my first real handover in it — that's the moment I stopped keeping my own spreadsheet.”
Maryam
Controls Engineer, Alpha Tester
HANDOVERCartoner Line Retrofit
ARTIFACTS17/17 PAIRED
REVISION CLASHES2 CAUGHT
[RECORD 02 // INTEGRATOR]ALPHA BUILD 0.9
“I was skeptical because I told him I want free and local, no accounts. It actually is. Readiness dashboard at 62% told me exactly what was missing before the customer asked — normally I'd find out at the worst possible moment.”
Neha
Automation Integrator, Alpha Tester
HANDOVERPackaging Line Commissioning
MODE100% OFFLINE
READINESS62% → 100%
[RECORD 03 // COMMISSIONING ENGINEER]ALPHA BUILD 0.9
“First tool I've used that understands a PLC backup and its PDF aren't the same thing. Export took four minutes, and the checksum manifest meant the customer's engineer could verify it without installing anything.”
Jeremy
Commissioning Engineer, Alpha Tester
HANDOVERFilling Line FAT
EXPORT4 MIN · SIGNED
VERIFYNO INSTALL NEEDED
LOCAL-FIRST·NO CLOUD·NO ACCOUNT·NO AI·AIR-GAP FRIENDLY
05 — COMMERCIAL SPECIFICATIONPERPETUAL HARDWARE LICENSE
TIER 01

Community

$0 free forever
  • →5 Active project releases
  • →Full local SHA-256 verification
  • →10 Industrial categories
  • →Offline executable binary
STATUS: CURRENT STABLE DOWNLOAD
TIER 02 // ILLUMINATEDRECOMMENDED

Pro Commercial

$149 one-time perpetual
FOUNDING ×10 — $99 [SLOTS AVAILABLE]
  • ✓Unlimited machine projects
  • ✓Custom OEM dossier cover & branding
  • ✓Commercial plant handoff rights
  • ✓Direct controls engineer email line
  • ✓All v1.x core engine revisions
Claim founding license ($99) →
REFUNDABLE ANYTIME · ZERO RECURRING FEES
TIER 03

Enterprise / Online

Q4 roadmap
  • →Multi-engineer site sync
  • →Customer cloud review room
  • →Active directory / SSO access
  • →ERP / MES automated pull
SPECIFICATION UNDER FORMULATION
06 — FREQUENTLY ASKED QUESTIONSAIR-GAP TECHNICAL ANSWERS
[Q01] Does it work air-gapped?
Yes. Fully. Viggen does not phone home, ever. There is zero telemetry, zero background network socket, and no analytics daemon. All cryptographic hashing and PDF compilation run strictly in memory on your workstation.
[Q02] Which operating systems?
Cross-platform — because that is where industrial automation software lives on plant field laptops. macOS builds follow for engineering leads and technical architects.
[Q03] Is it 21 CFR Part 11 compliant?
No. We do not claim regulatory FDA e-signature accreditation. Viggen provides tamper-evident cryptographic provenance. We prefer rigorous engineering truth over compliance buzzwords.
[Q04] What happens to my project data?
Nothing. It stays in your configured machine root directory (e.g. ~/Handover/). We have no cloud servers and couldn't read your files even if pressured.
[Q05] What happens if I outgrow 5 projects?
Unlock Pro with a single one-time license key. No monthly seat fees, no recurring credit card charges, no licensing dongle servers.